![]()
|
|||||||||||||||||||||||||||||||||
PSC Home![]() |
|
||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Water & Sewer |
|||||||||||||||||||||||||||||||||
|
Application Filing Requirements for Water Projects Requiring a Certificate of Authority from the PSC
A number of water utility construction projects require a Certificate of Authority (CA) from the Public Service Commission (PSC) pursuant to Wis. Stat. § 196.49, and these requirements are further described in Wis. Admin. Code ch. PSC 184. All projects are defined in Wis. Admin. Code ch. PSC 4 as either Type 1, 2, or 3 Actions. The vast majority of water construction projects that need a CA are Type 3 Actions and are not subject to these filing requirements but must follow Wis. Admin. Code ch. PSC 184. Specific information on water meter replacement projects and advanced metering infrastructure can be found here. A small number of water construction projects will be categorized as Type 2 Actions. Type 2 water projects are those projects which include the construction of a water pipeline three or more miles long and with a diameter of eight inches or greater. The application filing requirements also includes information requirements for obtaining wetland or waterway crossing permits from the Department of Natural Resources when coordinated reviews are required under Wis. Stat. § 30.025.
|
||||||||||||||||||||||||||||||||